Aerial of dozens of New Windsor Park houses in mid-construction across the eighteen-acre site
Construction · The New Windsor Park Phase 4 of 6 · Spring 2026

A hundred steps, per house.

One schedule. One production line. Ninety-three houses moving through it, block by block, from the first feasibility memo to the last walkthrough.

Tasks per house 100
Phases 6
Site 18acres
Handover Dec '26
Drone capture · Spring 2026
From the drone · Spring 2026
Foundations down. Framing up.
Phase 04 / 06 Block Central Coverage 18 ac
The sequence
How a house goes up

Six phases, in order.

Every house moves through these six phases. Blocks don't wait on each other — while the North Block is framing, the South Block is pouring slab. The whole site stays in motion.

01 Tasks 01 — 15

Planning & permitting

Everything that has to be true before a shovel hits the ground. Scope, feasibility, the team, the architecture, the site analysis, the financing, the permits, the budget, the bid, the contracts, the materials on order, the partners in the room.

02 Tasks 16 — 30

Site prep

Erosion controls and access roads go in first. Then survey, fence, clear, demo what's there, excavate, compact backfill, run drainage, run underground utilities, treat for termites, grade, inspect. Stage materials for what's next.

03 Tasks 31 — 45

Foundation

The base every house stands on. Footings formed and reinforced, concrete poured, forms stripped, cure time given, insulation and vapor barriers laid, plumbing roughed in, slab poured, final backfill. After this, the house has a footprint you can stand on.

04 Tasks 46 — 65

Framing

The house gets its shape. Sill plates, walls, headers, roof, sheathing, house wrap. Decks framed. Inspections cleared. Roofing prepped. Windows and doors set. By the end of this phase, the wind can't get in.

05 Tasks 66 — 85

Rough-in & closing the walls

Mechanical, electrical, plumbing — all inside the framing while it's still open. Then insulation, drywall, exterior finishes, trim, primer and paint, interior doors. The house starts to look like a house.

06 Tasks 86 — 100

Finishes & handover

Trim, paint, cabinets, counters, fixtures, flooring, appliances. HVAC commissioned. Final inspections. Deep clean. Walkthrough. Landscaping in. Keys handed over.

Live status
Where we are today

The build,
right now.

A snapshot from the latest site walk. Phases 1 and 2 are behind us. Foundations are nearly all in. Frames are going up across the middle of the site.

01 Planning & permitting Done
02 Site prep Done
03 Foundation 92%
04 Framing 58%
05 Rough-in 18%
06 Finishes & handover Up next
Aerial of dozens of houses in mid-construction across the eighteen-acre site Site walk · Spring 2026
Latest aerial
Spring 2026
Phases 3 — 4 in motion
Foundation & framing
Site inquiries

Visits, scheduling, updates.

Press, partners, contractors, and Windsor Park residents — the project team handles site access, schedule updates, and placement timing.